

(7) Contact information for the project applicant and property owner. (6) Water supply type (e.g., potable, recycled, well) and identify the local retail water purveyor if the applicant is not served by a private well. (5) Project type (e.g., new, rehabilitated, public, private, cemetery, homeowner-installed). (4) Total landscape area (square feet), including a breakdown of turf and plant material. (3) Project address (if available, parcel and/or lot number(s)). Cemeteries.Recognizing the special landscape management needs of cemeteries, new and rehabilitated cemeteries shall be designated as special landscape areas.Ĥ. Any project with an aggregate landscape area of two thousand five hundred square feet or less may comply with the performance requirements of this chapter or conform to the prescriptive measures of this section.Ī. Prescriptive requirements may be used as a compliance option to the landscape water use efficiency standards.ī. Compliance with subsections (A)(4)(c) through (A)(4)(h) of this section is mandatory and must be documented on a landscape plan in order to use the prescriptive compliance option.Ĭ. Submit a landscape documentation package (the director of public works and utilities will develop appropriate forms to carry out this section) which includes the following elements:

Applicability.This chapter shall apply to all of the following projects:ġ. New construction projects with an aggregate landscape area equal to or greater than five hundred square feet requiring a building permit, plan check or design review.Ģ. Rehabilitated projects with an aggregate landscape area equal to or greater than two thousand five hundred square feet within one twelve-month period requiring a building permit, plan check, or design review.ģ.

This section is included in your selections.Ī.
